Thinking about adding a shed to your Minnesota property? Before you start planning storage, a workshop, or a weekend escape, there’s one step that can bring it all to a standstill: permits.
Here’s the part most folks miss: Minnesota shed permits aren’t universal. From rural counties like Otter Tail to city neighborhoods in Hennepin, every township has its own zoning rules, size limits, and setback requirements. Miss one detail, and you risk fines, delays, or being told to tear it all down.
Do I Need a Shed Permit in Minnesota?

In most cases, yes you will need permits to build a shed in Minnesota, but the details depend on your shed’s size and where you live.
If your shed is 200 square feet or smaller and only one story, the Minnesota Residential Code doesn’t require a state building permit. However, many cities and townships still require a zoning permit to make sure your shed meets local rules for placement, setbacks, and property coverage.
If your shed is larger than 200 square feet, you’ll need a building permit, no matter where you are in the state. You’ll likely also need to meet zoning requirements specific to your city or county.
Adding electricity or plumbing? You’ll need separate permits for those, even in a smaller shed.
Quick Summary:
-
Under 200 sq ft? No state building permit, but local zoning approval is often still required.
-
Over 200 sq ft? Yes, a building permit is required statewide.
-
Utilities inside? Electrical, plumbing, or HVAC always need permits, regardless of size.
To avoid costly mistakes or delays, check with your local zoning or building department before you build. Minnesota shed permits vary by location, so getting the right info up front can save you time, money, and frustration.
Do I Need a Permit to Run Electricity to My Shed in Minnesota?

Yes, permits are required to run electricity in any shed in Minnesota. Even if your shed doesn’t require a building permit, electrical work always requires approval and inspection.
Electrical permits in Minnesota are issued by the Department of Labor and Industry (DLI) or your local building authority, depending on where you live. Before any wiring starts, you’ll need to apply for a permit, follow code-compliant installation standards, and pass both a rough-in and final inspection.
This applies to any permanent electrical work, including outlets, lighting, breaker connections, or underground cables. Temporary setups using extension cords don’t require a permit, but aren’t a long-term solution and may violate code if used improperly.
How Do I Get a Shed Permit in Minnesota?

Acquiring a shed permit in Minnesota is a straightforward process as long as you follow all the proper steps. Here is a breakdown of all the requirments to keep your project moving smoothly.
1. Figure Out What Type of Permit You Need
-
Sheds 200 sq ft or less (one story): No building permit is required by state code, but many towns still require a zoning permit to confirm setbacks, height limits, and location.
-
Sheds over 200 sq ft: You’ll need a building permit and likely a zoning permit, too.
2. Contact Your Local Municipality
Permit rules can vary widely between cities and counties. Reach out to your local zoning or building department to get the exact requirements, forms, and fee details for your area.
3. Gather the Right Documents
You’ll typically need:
-
A site plan showing where the shed will go
-
Basic construction details or drawings
-
Any required zoning paperwork
If your shed includes electricity or plumbing, you’ll also need separate trade permits for those.
4. Apply for Your Permit
Many areas now offer online applications through local websites or the Minnesota Department of Labor and Industry (DLI) portal. Upload your documents, pay the permit fee, and wait for approval.
Final Step: Get Inspections (If Required)
If your permit requires inspections, such as for structural work or electrical installation, you’ll need to schedule those before and after the work is done.
Shed Permit Requirements in Minnesota Counties
In Minnesota, shed permits aren’t handled at the state level alone as each county, city, and township sets its own rules. That means whether you need a permit (and which kind) depends on where you’re building.
Permits are typically based on your shed’s size, height, and location on the property. In some areas, a small, one-story shed under 200 square feet might not need a building permit, but you’ll likely still need zoning approval to ensure it meets local setback and property line regulations.
You’ll also want to factor in things like easements, HOA restrictions, and local ordinances, which can all affect where and how you build. To help you get started, we’ve highlighted what all the Minnesota counties require when it comes to shed permits, so you can stay compliant and keep your project on track.
Does Aitkin County, MN, Require Shed Permits?
Yes, Aitkin County does require a land use permit for most sheds, especially in unincorporated areas. Whether you’re building a small backyard structure or placing a prefab shed, you’ll need approval from the county before starting.
The permit process includes submitting a site plan that shows where your shed will go in relation to property lines, roads, and any nearby lakes or wetlands. Aitkin County has specific setback requirements, and sheds placed too close to lot lines or shorelines can lead to delays or denials. If your property is within city limits (like the City of Aitkin), permit rules may differ and are handled at the local level.
If you’re building outside city limits, a land use permit is required, no matter the shed size. To get started, visit Aitkin County’s Land Services Department for forms, fees, and online applications.
Does Anoka County, MN, Require Shed Permits?
Yes, but here’s the catch: Anoka County doesn’t issue building permits directly. Instead, shed permits are handled by your city or township, and requirements can vary widely depending on where you live.
Most local governments in Anoka County require a zoning or land use permit for sheds of any size and a building permit for structures over 200 square feet. Even smaller sheds often need to follow specific setbacks, height limits, and property coverage rules. If you’re in an unincorporated area or planning a larger structure (like a pole barn), additional reviews may apply.
To stay compliant, check directly with your city or township’s building department. You can also visit Anoka County’s construction permits page for general guidance.
Does Becker County, MN, Require Shed Permits?
Yes, Becker County requires a land use permit for sheds, whether you’re building new or moving an existing structure onto your property.
If your shed is going in an unincorporated area, you’ll need to apply through the county’s Planning & Zoning Department. The permit application includes a basic site plan showing where the shed will sit, along with property lines and setbacks. Fees are based on the total value of your project, starting around $50 for smaller builds. If your property is located within the City of Becker, you’ll need to apply through the city’s Building Department instead, as they handle permits separately from the county.
Whether you’re inside city limits or not, Becker County expects you to pull a permit before placing a shed. Visit the Becker County Permits & Forms page to get started.
Does Beltrami County, MN, Require Shed Permits?
Yes, but only in certain areas. Beltrami County requires a building permit for any shed placed within 1,000 feet of a lake or 300 feet of a river, which are considered shoreland zones. These areas are regulated to protect natural resources and ensure proper setbacks.
If your shed is outside of shoreland, permitting is usually handled by your township or city, and requirements may vary. In most cases, you’ll still need to follow local rules for size, placement, and distance from property lines.
If your property is near water, you’ll need a county-issued permit. Otherwise, check with your local jurisdiction. To get started, visit the Beltrami County Environmental Services page for maps and application info.
Does Benton County, MN, Require Shed Permits?
Yes, shed permits are required in Benton County, but the rules depend on size and location. If your shed is over 200 square feet, you’ll need both a land use permit from the county and a building permit through Inspection Services of Central Minnesota. For sheds under 200 square feet, you can skip the permits, but you still need to follow zoning rules like setbacks from property lines and other structures.
If your property is inside city limits or in Watab Township, permit requirements may differ, and you’ll need to apply through your city or township directly.
Small sheds don’t require a permit but must meet zoning standards. Larger sheds (200+ sq ft) require county approval. You can get started on the Benton County Building Permit page.
Does Big Stone County, MN, Require Shed Permits?
Yes, Big Stone County requires a building permit for most sheds, especially if they’re over 200 square feet in size. This applies to nearly all shed types, including storage, hobby, and even agricultural use.
If your shed is under 200 sq ft, you may not need a permit, but you’re still expected to follow zoning regulations like setbacks and placement. Starting construction before getting your permit approved could result in double permit fees, so it’s best to check first.
If your shed is 200 sq ft or larger, you’ll need a permit. To stay in the clear, contact the county’s Planning & Zoning Department and request the building permit application.
Does Blue Earth County, MN, Require Shed Permits?
Yes, Blue Earth County requires a construction permit for most sheds built in unincorporated areas. Whether you’re building a brand-new shed or moving an existing one, you’ll need approval from the county’s Property & Environmental Resources Department.
Sheds under city jurisdiction (like Mankato or Lake Crystal) fall under local permitting rules, so you’ll need to check with your city’s building department instead. Permits typically cost $100 for accessory buildings and are valid for one year. Skip the permit, and you risk fines or delays, especially if your shed includes a permanent foundation.
If you’re outside city limits, you’ll likely need a county permit. Get full details and apply through the Blue Earth County Construction Permits page.
Does Brown County, MN, Require Shed Permits?
Yes, Brown County requires a construction permit for sheds in unincorporated areas. Whether you’re building new, relocating, or expanding a shed, you’ll need approval from the Planning & Zoning Department.
Zoning rules apply too, so your shed must meet local setback and land use requirements. If your property is within city limits like New Ulm or Sleepy Eye, you’ll need to follow your city’s permitting process instead.
If you’re outside a city and planning to add a shed, apply for a county permit first. You can find the application on the Brown County Planning & Zoning page.
Does Carlton County, MN, Require Shed Permits?
Yes, Carlton County requires a zoning permit for all sheds, no matter the size. Whether you’re building a small garden shed or a larger structure, permits are needed in all unincorporated areas.
The county doesn’t enforce the State Building Code in most rural zones, but zoning regulations still apply, including rules for placement, setbacks, and shoreland restrictions. If your property is near a lake or river, additional shoreland review may be required. If you live in a city like Cloquet or Moose Lake, permits are handled locally, not by the county.
All sheds in unincorporated Carlton County need a zoning permit. Get started with the Carlton County GeoPermits system.
Does Carver County, MN, Require Shed Permits?
Yes, Carver County requires a zoning permit for all sheds, and a building permit if your shed is over 200 square feet in size. These rules apply to unincorporated areas and are in place to ensure proper placement and land use compliance.
Even smaller sheds (under 200 sq ft) need zoning approval to meet setback requirements. If you’re within the City of Carver, the same 200 sq ft rule applies, zoning approval is always required, and larger sheds will need a full building permit.
No matter the size, all sheds in Carver County need zoning approval. For anything over 200 sq ft, you’ll also need a building permit. Visit Carver County Land Management or the City of Carver Permits page to get started.
Does Cass County, MN, Require Shed Permits?
Yes, if you’re adding a shed in unincorporated Cass County, a land use permit is required. Whether you’re building, moving, or expanding a shed, you’ll need approval from the Environmental Services Department before starting.
If your property is near a lake or river, it likely falls within a shoreland zone, which means you’ll also need a Shoreland Alteration Permit. These extra rules help protect Minnesota’s natural waterways. Inside city limits? You’ll need to check with your local municipality, as city permit rules apply separately.
Most sheds in Cass County require a zoning permit, and additional approval may be needed in shoreland areas. Visit the Cass County Land Use & Zoning page to apply.
Does Chippewa County, MN, Require Shed Permits?
Yes, if you’re planning to add a shed in Chippewa County’s unincorporated areas, a land use permit is required. This applies whether you’re building a new structure, relocating one, or expanding an existing shed.
Permits help ensure your shed meets setbacks, zoning rules, and land use regulations—especially if your property is near a floodplain or protected shoreland. If you live within a city like Montevideo, you’ll need to follow your local building department’s rules instead.
Most shed projects outside city limits need a land use permit. Get full details and the application at the Chippewa County Zoning page.
Does Chisago County, MN, Require Shed Permits?
Yes, Chisago County requires permits for most shed projects in unincorporated areas. If your shed is over 200 square feet, you’ll need a building permit. Smaller sheds may be exempt from building permits but still need zoning review, especially if they’re near property lines, lakes, or other setback-sensitive areas.
Some townships, like Chisago Lake, direct residents to apply through the county’s Environmental Services department. If you’re inside city limits, permit requirements will depend on your local municipality.
If you’re building a shed in Chisago County, check both size and location. Apply for permits through the Chisago County Permits Portal to get started.
Does Clay County, MN, Require Shed Permits?
Yes,if you’re adding a shed in unincorporated Clay County, a Building & Land Alteration Permit is required. This applies to new construction, additions, and even the relocation of an existing structure.
You’ll need to submit an application, include a simple site sketch, and get approval from your township official, some may require you to attend a meeting before signing off. Permit fees are based on the value of your shed, starting at $25 plus $1 per $1,000 of value. If you’re within city limits like Moorhead or Dilworth, you’ll need to follow city-specific rules instead.
Sheds in rural Clay County need a permit. Start the process by visiting the Clay County Planning & Zoning page.
Does Clearwater County, MN, Require Shed Permits?
Yes, shed permits are required in Clearwater County, especially for properties outside city limits. If you’re in an unincorporated area, you’ll need a Land Use Permit before building, placing, or expanding a shed. This applies to most structures, regardless of size, and is especially important if your property is near a lake or within a designated shoreland area.
If you live inside city limits, such as the City of Clearwater, the rules shift slightly—smaller sheds (under 200 sq ft) may only need an accessory structure permit, while larger ones will require a full building permit.
If you’re in Clearwater County, make sure to check your location and get the right permit before you build. You can find what you need on the Clearwater County Applications & Permits page.
Does Cook County, MN, Require Shed Permits?
Yes, most sheds in unincorporated Cook County require a Land Use Permit, especially if the structure is larger than 160 square feet or will be used for any habitable purpose. Even smaller sheds may require approval if they’re placed in shoreland zones or sensitive areas.
Permits are handled through the county’s online ePermitting system, and you’ll need to provide basic plans, site layout, and pay a small fee (typically a $50 application fee plus a $250 refundable deposit). If you’re within a city like Grand Marais, you’ll need to follow local permit rules instead.
If you’re building a shed in Cook County, check the size and location first. Then head to the Cook County Land Use Permits page to get started.
Does Cottonwood County, MN, Require Shed Permits?
Yes, if you’re in unincorporated Cottonwood County, you’ll need a setback permit before building or moving a shed. These permits help ensure your structure follows county rules for placement, especially when it comes to required distances from property lines and roads.
Fees are affordable and based on project value, but keep in mind that starting without a permit will double your fee. If your property is inside a city like Windom, shed permits are handled through the city instead.
Most sheds in Cottonwood County need a permit before construction. To get started, visit the Cottonwood County Planning & Zoning page.
Does Crow Wing County, MN, Require Shed Permits?
Yes, most sheds in Crow Wing County require a land use permit, especially if your structure is over 160 square feet or you’re building near a lake or wetland. Sheds under that size may be exempt, but only if they meet all zoning setbacks and are placed outside shoreland or sensitive areas.
If you’re located inside city limits like Brainerd or Baxter, then you’ll need to apply through the city, not the county.
In unincorporated areas, always check size, setbacks, and location. To learn more or apply online, visit the Crow Wing County Permit Information page.
Does Dakota County, MN, Require Shed Permits?
Yes, but the rules depend on where your property is located. If you’re in a city or township within Dakota County, you’ll need to check with local building departments, they handle most shed permits.
If your shed site is in a shoreland, floodplain, or drainage area, you may also need special approval from the Dakota County Water Resources Department. That’s especially true for unincorporated or rural parts of the county.
Your city or township handles standad shed permits, but Dakota County steps in for environmentally sensitive areas. You can get started on the Dakota County Building & Zoning Permits page.
Does Dodge County, MN, Require Shed Permits?
Yes, most shed in Doodge County require a zoning/land use permit, and this is more prevelant in unincorporated areas. Even smaller storage structures need approval before construction or placement begins.
To apply, you’ll need a completed permit form, a simple site plan, and the required fee—starting at $50. If you build without one, expect to pay double. If your property is located inside city limits, check with your local city office as shed rules may differ.
Don’t start your shed without a permit. Visit Dodge County’s Permits & Forms page to get started.
Does Douglas County, MN, Require Shed Permits?
Yes, if you’re building a shed in unincorporated Douglas County, you’ll need a land use permit before starting any construction. Whether it’s a new build or moving a shed onto your lot, the county requires approval to ensure your project meets zoning rules and setbacks.
You’ll need to submit a site plan, structure details, and pay a fee. The review process can take up to 15 business days, so plan ahead. If your property is inside a city like Alexandria, permit rules come from the city’s building department, not the county.
: In rural Douglas County, get your land use permit before building. Start here: Douglas County Land Use & Zoning.
Does Faribault County, MN, Require Shed Permits?
Yes, if you’re planning to build or move a shed in Faribault County, a building permit is required in most cases. This applies to both new sheds and modifications to existing structures in unincorporated areas.
Your project must also meet local zoning rules, including setbacks and lot coverage. Permits are valid for one year and must be approved before construction begins. If you live within a city like the City of Faribault, then check with your local building department, as they manage their own permit process.
Start your application here: Faribault County Building Permits.
Does Fillmore County, MN, Require Shed Permits?
Yes, if you’re planning to build or move a shed in unincorporated Fillmore County, a land use permit is required. The county regulates all accessory structures to make sure they meet local zoning codes, setbacks, and environmental requirements like shoreland or floodplain rules.
Permit fees typically depend on the shed’s size, and building without one can lead to extra charges. Inside city limits, though, you’ll need to contact your local municipal office since most towns handle permitting separately.
To apply, visit Fillmore County’s zoning page and download the accessory building permit form.
Does Freeborn County, MN, Require Shed Permits?
Yes, Freeborn County typically requires a permit before building a shed, especially if it’s larger than 200 square feet or used for agricultural purposes.
If your shed is under 200 square feet and in an unincorporated area, you’ll still need a Small Structure Permit to ensure it complies with local zoning requirements. For agricultural buildings or larger structures, an Agricultural Building Permit is necessary. Live within city limits like Albert Lea? You’ll need to go through your city’s permitting office instead of the county.
To apply, head over to the Freeborn County Building Permits page where you can download the appropriate forms, include a site plan, and get started.
Does Goodhue County, MN, Require Shed Permits?
Yes, most sheds in Goodhue County do require permits, especially if you’re building in an unincorporated area. Both a building permit and township zoning approval are typically needed before construction begins.
You’ll need to submit site plans showing setbacks from property lines, roads, and any nearby wells or septic systems. In some cases, extra details like shoreline buffers or bluff zones might come into play. The county handles inspections and permitting for several small towns, while cities like Red Wing or Lake City have their own permit process but still coordinate inspections through the county.
To get started, visit Goodhue County’s permit page or call the Building Department at 651‑385‑3114.
Does Grant County, MN, Require Shed Permits?
Yes, Grant County, MN, does require a permit for most shed projects, though the process depends on where you’re located.
If your property is in the City of Grant, you’ll need to apply for a building permit before constructing your shed, especially if it’s larger than 120 square feet or includes utilities. The city typically reviews and approves permits within a few business days.
In rural or unincorporated areas of Grant County, a Site Permit is required through the Environmental Services Department. This permit ensures your shed meets zoning, setback, and land use regulations, even for smaller structures. The application includes a basic site plan and costs $100.
To apply, visit the Grant County Site Permits page or reach out to your local planning office for location-specific rules.
Does Hennepin County, MN, Require Shed Permits?
Hennepin County doesn’t directly issue building permits for sheds, as each city or township handles those. So whether you’re in Minneapolis, Bloomington, or a smaller town, shed regulations vary by location.
Generally, a permit isn’t required for a shed under 200 square feet if it’s a single story and used strictly for storage. But if your shed includes electricity, plumbing, or a permanent foundation, a building permit will likely be needed. And even if you’re under that size limit, many municipalities still require zoning or site plan approval to ensure your shed follows local setback rules.
If your property is near a shoreline, wetland, or floodplain, or the shed is close to a county road, you may also need special approval from Hennepin County or the state.
Best move? Contact your city’s building department first, then double-check with the county if you’re near protected areas.
Does Houston County, MN, Require Shed Permits?
Yes, Houston County does require shed permits, at least in most cases. If you’re building, moving, or expanding a shed in unincorporated areas of the county, you’ll need a zoning (land-use) permit from the Houston County Planning and Zoning office. This helps make sure your shed meets county standards like setbacks, floodplain rules, and shoreland protections.
If your property is within city limits (like La Crescent, Caledonia, or Houston), permitting will go through your local city’s building department instead.
For county permits, visit the Houston County Zoning & Planning page or call 507‑725‑5800.
Does Hubbard County, MN, Require Shed Permits?
Yes, Hubbard County requires a permit for nearly all shed builds, even small ones. Whether you’re placing a shed on a slab, skids, or footings, a Land Use Permit is typically required before construction or delivery begins.
If your property sits near a lake (within 1,000 feet) or river (within 500 feet), shoreland rules kick in so expect extra approvals. And if your shed is inside city limits like Park Rapids, you’ll need to check with that specific city office instead of the county.
Permits stay valid for 12 months and can be extended once if needed. To apply, visit the Hubbard County Environmental Services page or call (218) 732-3890.
Does Isanti County, MN, Require Shed Permits?
In Isanti County, shed permits are generally required based on the size and placement of the structure. For properties in unincorporated areas, sheds under 200 square feet usually don’t need a building permit but must still meet zoning requirements such as setbacks from property lines. If your shed is over 200 square feet, both a zoning and building permit will likely be necessary.
Within city limits, such as the City of Isanti, permits are more strictly enforced. All sheds typically require a zoning permit, and anything over 200 square feet will also need a building permit according to Minnesota’s building code.
For full details, visit the Isanti County Zoning Department or the City of Isanti Building Inspections page.
Does Itasca County, MN, Require Shed Permits?
Yes, Itasca County requires a zoning permit for most sheds, especially if you’re placing, expanding, or relocating a structure. Even smaller buildings need approval when they’re built near protected areas like lakes, rivers, or wetlands.
If your shed is going in an unincorporated part of the county, you’ll need to apply through the Environmental Services Department. You’ll be asked to provide a site plan showing property lines, setbacks, and any nearby water features. Permits typically last 12 months and must be in hand before you begin construction.
For city properties like Grand Rapids, check with your local city office instead, as shed rules can differ.
You can call the county at 218‑327‑2857 or apply for the permit here.
Does Jackson County, MN, Require Shed Permits?
Yes, Jackson County, MN, typically requires a permit for building or placing a shed, especially in unincorporated areas. If you’re adding a new shed, expanding an old one, or moving a structure onto your property, you’ll need to go through the county’s Land Management Office to apply for a zoning or land use permit. Building permits may also apply, depending on the size and scope.
For properties within city limits, such as the City of Jackson, permit requirements are handled separately through the local building and zoning department.
To get started, visit Jackson County’s Planning & Zoning page for permit forms and contact details.
Does Kanabec County, MN, Require Shed Permits?
Yes, Kanabec County typically requires a permit for shed construction. especially if your property is near a lake or river. Sheds located within designated shoreland areas must follow the county’s Shoreland Ordinance, which means you’ll need a Building Site Permit from the Environmental Services Department.
For properties outside of these zones, it depends on your local township or city. Each has its own permitting rules, so be sure to check with your township office or city hall if you’re not in a shoreland district.
To learn more or get started, contact Kanabec County Environmental Services at 320‑679‑6456 or visit their Shoreland Management page.
Does Kandiyohi County, MN, Require Shed Permits?
Yes, Kandiyohi County generally requires permits for sheds, though the specifics depend on your property and structure:
In unincorporated areas, most accessory buildings (including sheds) need a Land Use Permit. If your shed is over 200 sq ft or functions like a garage or workshop then you’ll also need a Building Permit. Structures in shoreland zones may trigger additional reviews, including septic compliance and zoning inspections. Within city limits such as in Willmar or Kandiyohi shed permitting falls under the city’s building department rather than the county’s.
To get started, contact the Kandiyohi County Environmental Services at (320) 231‑6229 or visit their Building & Land Use Permit page to determine which permits apply to your situation.
Does Kittson County, MN, Require Shed Permits?
Yes, Kittson County generally requires a permit for sheds and similar structures. Whether you’re building new, expanding, or moving a shed onto your property, a zoning or land use permit is needed, even in smaller towns like Kennedy, which follow county zoning rules. You’ll need to submit a site plan showing structure placement and meet local setback requirements.
To avoid delays or issues, contact the Kittson County Zoning Office at 218‑853‑2114 or visit their official page: Kittson County Zoning.
Does Koochiching County, MN, Require Shed Permits?
Yes, Koochiching County requires a permit for most shed projects, especially if you’re building or altering a structure on land outside city limits. The county’s Environmental Services office handles Land Use Permits, which must be approved before any construction begins. Zoning rules, including shoreland and floodplain ordinances, often apply depending on your property’s location.
If you’re within a city like International Falls or Big Falls, shed permits are issued by the local municipality instead of the county.
To learn more or get started, visit Koochiching County’s Planning & Zoning page or call 218‑283‑1157.
Does Lac qui Parle County, MN, Require Shed Permits?
Yes. Lac qui Parle County requires a zoning (land-use) permit for virtually all sheds and accessory buildings in unincorporated areas. This includes small storage structures and larger workshops, as the county uses the permit to enforce setback, floodplain, shoreland, and lot‐coverage rules.
If you live inside city limits such as Madison, Dawson, or Montevideo then you’ll apply through your city’s building or zoning department instead, and county rules generally don’t apply.
To start the process, download the permit application from the county’s Planning & Zoning website and check setback and ordinance requirements. You can also call the county office at 320‑598‑3319 for help.
Does Lake County, MN, Require Shed Permits?
Yes, Lake County, MN requires a Land Use Permit for any structure over 3 feet tall, which includes nearly all sheds, playhouses, fabric shelters, decks, and outhouses .
Unincorporated property owners need this permit before placing or building a shed. If your land is near a shoreline or in a floodplain, additional rules apply (for lot coverage, setbacks, and soil disturbance). The permit fee is $50 for non‑dwelling structures, with steeper penalties for after-the-fact approvals . Properties inside cities (like Two Harbors) follow municipal permitting procedures instead of county rules.
To apply or find forms, contact Lake County Planning & Zoning at (218) 834‑8327 or visit the Lake County Planning & Zoning page .
Does Lake of the Woods County, MN, Require Shed Permits?
Yes, shed permits are required in most parts of Lake of the Woods County, MN, especially in unincorporated areas. If you’re building a shed, you’ll need a Land Use Permit before starting any site work. This includes accessory structures like sheds over 100 square feet and applies even more strictly in shoreland and floodplain zones, where setbacks and environmental guidelines are enforced.
If your property is inside city limits (like Baudette or Williams), check with your local city office, as permitting is handled separately from the county.
To get started, visit the Land & Water Applications page or call the Land & Water Planning Office at (218) 634-1945 for help with permits, fees, and specific setback requirements.
Does Le Sueur County, MN, Require Shed Permits?
Yes, Le Sueur County requires permits for most sheds, especially in unincorporated areas. A zoning permit is typically needed before placing or building a shed, regardless of whether it’s permanent or portable. Even smaller sheds under 100 square feet must still meet important land use standards like setbacks from property lines, roads, and environmental features.
If your shed is going near a lake, bluff, or within a floodplain, additional restrictions apply. You’ll need to provide a site plan and complete the county’s zoning permit application. Permits are valid for one year.
For properties inside city limits (like the City of Le Sueur), you’ll need to follow local rules and apply for a shed or accessory structure permit through the city.
For more information or to apply, visit the Le Sueur County Permit Forms & Fees page. If you’re within the City of Le Sueur, call the Building Department at 507-593-8317.
Does Lincoln County, MN, Require Shed Permits?
If you’re building a shed in Lincoln County, MN, a zoning permit is typically required, especially for new construction, additions, or moving a structure onto your land. Sheds must meet setback and land use regulations, and failing to get a permit in advance could result in double fees.
For properties located inside city limits, permit requirements may differ. In that case, reach out to your city’s zoning office directly.
You can download the permit application on the county website or get help by calling Lincoln County Environmental Services at (507) 694-1344.
Does Lyon County, MN, Require Shed Permits?
In Lyon County, MN, a zoning or land use permit is typically required before placing or building a shed, especially if you’re outside city limits. These permits help ensure your structure follows local setbacks and zoning rules.
For properties inside cities like Marshall or Balaton, you’ll need to follow that city’s building guidelines. For example, Marshall does not require a permit for sheds under 200 square feet unless utilities are added, but zoning approval may still be necessary.
To stay compliant, reach out to the Lyon County Planning & Zoning Department or call 507-532-8206 for more info on shed permits and site requirements.
Does Mahnomen County, MN, Require Shed Permits?
Yes, Mahnomen County requires shed permits in most cases. If you’re building in unincorporated areas, you’ll need a Land Use Permit from the Zoning & Sanitation Office, especially if your shed is near a lake, river, or wetland. Shoreland rules apply within 1,000 feet of lakes and 300 feet of rivers, so even smaller sheds might need approval.
If your property is within city limits (like Mahnomen, Bejou, or Waubun), check with your local city office, as permitting is handled separately.
For questions or to start your application, contact the Mahnomen County Zoning & Sanitation Office at 218-935-5639.
Does Marshall County, MN, Require Shed Permits?
Marshall County, MN, does require permits for most shed installations, especially if your shed will be taller than 3 feet, include utilities, or be located near shoreland or floodplain areas. In unincorporated parts of the county, you’ll need a land use/building permit from the Environmental Services Department to make sure your project meets zoning and land-use rules.
If you’re placing a shed within the City of Marshall, you’re allowed to build one up to 200 square feet without a permit—so long as it’s a single story with no plumbing, heating, or electrical systems. Anything larger or with utilities will require a building permit.
For questions or to get started, contact Marshall County Environmental Services at 218‑745‑5841 or the City of Marshall at 507‑537‑6773.
Does Martin County, MN, Require Shed Permits?
Yes, Martin County, MN, typically requires a shed permit for new construction, placement, or significant alterations, especially in unincorporated areas. Sheds must follow zoning rules like setbacks, maximum height, and property line distances.
If you’re outside city limits, you’ll need to apply through the Martin County Planning & Zoning office. Expect to submit a site plan and pay a permit fee (starting around $150). In cities like Fairmont, permit requirements are handled separately by the local building department, so it’s best to check with them directly.
For permits or zoning info in rural Martin County, contact Planning & Zoning at 507-238-3242 or visit them at 201 Lake Avenue, Room 104, Fairmont, MN.
Does McLeod County, MN, Require Shed Permits?
Yes, McLeod County, MN generally requires a permit for building or placing a shed—especially in unincorporated areas. The county’s Environmental Services department reviews permit applications to ensure your shed meets zoning rules like setbacks, floodplain restrictions, and septic system clearance. Even moving or modifying a shed may trigger permit requirements.
If you live in a city like Hutchinson, you’ll need to check with your local building department. However, county-wide rules (such as floodplain zoning) may still apply.
For the most accurate info, contact McLeod County Environmental Services at 320‑484‑4300 or visit their Land Use Permits page.
Does Meeker County, MN, Require Shed Permits?
Yes, Meeker County, MN requires a permit for most sheds, especially those built, moved, or altered in unincorporated areas. Even small sheds may need zoning approval depending on their size and location.
In general, you’ll need to submit a permit application, a detailed site plan, and ensure your shed meets zoning setbacks. Structures under 200 square feet may be exempt from a building permit in some zones, but that doesn’t always remove the need for zoning review.
To avoid delays or issues, it’s best to contact the Meeker County Land Use Office at 320‑693‑5290 or the Building Official at 320‑693‑4650. You can also visit the official Land Use & Permits page here for forms and more guidance.
Does Mille Lacs County, MN, Require Shed Permits?
Yes, Mille Lacs County requires permits for most sheds. If your shed is 200 square feet or smaller, you may skip the building permit, but zoning approval is still required. Once you go over 200 square feet, a full building permit is necessary.
You can apply online using the county’s permitting portal. Just make sure to include a site plan and follow all zoning rules. If you live inside city limits like Milaca or Princeton, check with your local city office for building permit requirements.
For more details or to get started, contact the Mille Lacs County Zoning Office at 320-983-8308 or visit their Planning & Zoning page.
Does Morrison County, MN, Require Shed Permits?
Yes, Morrison County, MN, requires permits for most sheds, regardless of size or foundation type. Whether you’re planning to build a small storage shed or a larger outbuilding, you’ll need a Land Use Permit through the Planning & Zoning Department before starting construction.
Permits are required for all structures, not just those with permanent foundations—and you’ll need to follow local setback requirements. Fees typically start at $80, with an additional cost based on the square footage of your shed.
If your property is inside an incorporated city like Little Falls, check with that city’s building department, as their requirements may differ.
For more details or to apply, contact Morrison County Planning & Zoning at 320-632-0170 or visit their Planning & Zoning page.
Does Mower County, MN, Require Shed Permits?
Yes, Mower County requires a zoning permit for any shed, whether it’s portable, permanent, large, or under 200 square feet. You’ll need to submit a site plan showing your shed’s location and distance from property lines, roads, shorelines, and flood zones. The standard fee is $75, but if the shed is placed before approval, expect to pay a penalty of 1.5× that amount.
If your property is inside city limits (like Austin), you’ll likely need a city-issued building permit as well. Always double-check with the correct office to avoid delays.
For more details, contact Mower County Environmental Services at 507-437-9560 or email zoning@co.mower.mn.us.
Does Murray County, MN, Require Shed Permits?
Yes, Murray County, MN requires a zoning certificate before you can place or build a shed in unincorporated areas. This applies to both permanent and portable structures, regardless of size. The county uses this process to ensure all buildings comply with local zoning, environmental, and floodplain regulations.
If your property is inside city limits such as Slayton or Hadley then shed permits are handled by your local municipality instead of the county.
For questions or to apply, contact Murray County Environmental Services at (507) 836-1174 or visit their Planning & Zoning page.
Does Nicollet County, MN, Require Shed Permits?
Yes, Nicollet County, MN, requires a zoning permit before you build or place a shed, even if it’s a small or prefabricated structure. In unincorporated areas, an Accessory Structure Zoning Permit is needed to ensure your shed meets setback rules and land use requirements. While sheds under 200 square feet may be exempt from a state building permit, zoning approval is still required.
If you’re within city limits (like Saint Peter or North Mankato), shed permits are handled by the local city offices instead of the county.
To apply, download the permit application from Nicollet County’s Planning & Zoning page, then submit your site plan and shed details to niccopermitapps@co.nicollet.mn.us or call 507‑934‑7070 with questions.
Does Nobles County, MN, Require Shed Permits?
Yes, Nobles County, MN does require shed permits. If you’re building in an unincorporated area, you’ll need a zoning permit for nearly all sheds and accessory structures. The permit fee is based on the square footage, with a $50 minimum.
If your property is within a city like Worthington, you’ll also need a building permit through the city, but county zoning regulations still apply and will be reviewed.
For details on fees or to download the permit form, visit Nobles County Environmental Services.
Does Norman County, MN, Require Shed Permits?
Yes, Norman County, MN requires a permit before you build or place a shed on unincorporated land. Here’s a breakdown:
For rural properties, a Building Permit is mandatory. Sheds under 250 sq ft cost $25, while larger ones cost $50. Filing late can double the fee and add $150, so it pays to apply early.
You’ll need to submit a site plan with setbacks (like 100 ft from roads, 60 ft side yards), and address floodplain, shoreland, and septic compliance. While sheds under 200 sq ft are exempt from state building permits, county zoning still applies. If your land is in a shoreland or floodplain zone, extra county-level approvals are required. Use 218‑784‑5493 to confirm. For properties inside towns like Twin Valley, obtain a city-issued building or land-use permit instead of the county one.
To get started, download the Building Permit Application from Norman County’s website or call Planning & Zoning at 218‑784‑5493.
Does Olmsted County, MN, Require Shed Permits?
Yes, Olmsted County, MN, does require permits for sheds depending on size and location. If your shed is larger than 200 square feet, you’ll need both a building permit and zoning approval. For anything smaller, a zoning certificate is still required to ensure proper placement and setback compliance.
Whether you’re in an unincorporated area or within city limits like Byron or Stewartville, it’s best to check with the county to confirm what applies to your property.
For more details or to get started, contact the Olmsted County Planning & Zoning Office at 507‑328‑7100.
Does Otter Tail County, MN, Require Shed Permits?
Yes, Otter Tail County, MN, does require shed permits, depending on the size and location of the structure. Sheds under 120 square feet typically do not need a permit unless they’re built in a shoreland or bluff impact zone. Any structure larger than 120 square feet, or anything located within protected environmental zones, will require a Structure and Shoreland Alteration Permit.
If your property is within a city like Fergus Falls or Ottertail, you’ll need to check directly with the city’s zoning department, as local rules apply separately from county regulations.
For more info, contact the Otter Tail County Planning & Zoning Office at 218-998-8105 or visit their Shoreland Permit Applications page.
Does Pennington County, MN, Require Shed Permits?
In Pennington County, MN, a shed permit is typically required before adding any accessory structure to your property. Whether you’re installing a backyard storage shed, pole barn, or detached garage, you’ll need to apply for a building permit through the county’s Planning Department.
If your property sits near a lake, river, or stream, additional permitting may be necessary under the county’s Shoreland Ordinance. Plan ahead as permit reviews usually take around 10 business days.
For questions or applications, contact the Pennington County Planning Department at (218) 683-7025.
Does Pine County, MN, Require Shed Permits?
In Pine County, MN, shed permits depend on size and location. If your shed is 120 square feet or smaller and not located in a shoreland, floodplain, or bluff impact zone, you typically won’t need a county permit, unless your township has opted into county zoning. However, anything larger or placed in a regulated area will require a Building Site Permit.
If your shed will be in a city like Pine City, you’ll need to follow city-specific zoning and permitting rules instead of the county’s.
For details, contact Pine County Environmental Services at 320-216-4220 or check their Building Site Permits page.
Does Pipestone County, MN, Require Shed Permits?
Pipestone County, MN does require permits for most sheds, especially in unincorporated areas. A Land Use Permit is typically needed for any new or relocated structure, including sheds, even those as small as 150 square feet. These permits are handled by the county’s Environmental Services office and ensure your project complies with zoning and land use rules.
If you’re located within the City of Pipestone, sheds under 150 square feet are generally exempt from a building permit. However, anything larger may still need approval based on local zoning codes and Minnesota State Building Code requirements.
For help with permits in rural areas, contact Pipestone County Environmental Services at 507‑825‑1185. For city-specific guidelines, reach out to the City of Pipestone Building Official at 507‑825‑3324.
Does Polk County, MN, Require Shed Permits?
Yes, Polk County, MN, does require a permit for sheds in most cases, especially in unincorporated areas. A land-use or zoning permit is typically needed before you begin construction, regardless of the shed’s size. These permits help ensure your structure complies with setbacks, floodplain rules, and shoreland management guidelines.
If your property is within a city in Polk County, you’ll need to check with that specific city’s building department instead, as local rules will apply there.
For help with permitting or zoning questions, contact Polk County Planning & Zoning at 218‑281‑5700 or visit their official website.
Does Pope County, MN, Require Shed Permits?
Yes, Pope County, MN requires permits for most sheds and accessory structures. If you’re building or placing a shed you’ll need to apply for a Land Use Permit to meet local zoning requirements. While buildings under 144 square feet may be exempt from needing a building permit, they still must follow proper setbacks and zoning rules, especially near lakes or floodplains.
If your shed is going within city limits, like Glenwood, check with the local city office for separate requirements. To begin the permitting process, contact Pope County Environmental Services at 320‑634‑5443 or visit their Land Use Permits page for forms and more details.
Does Ramsey County, MN, Require Shed Permits?
In Ramsey County, MN, shed permits are required depending on the size and location of your structure. Most cities within the county allow sheds up to 200 square feet without a building permit, as long as they don’t include utilities. However, zoning rules still apply. That means your shed must follow local setback requirements and be properly anchored.
Once your shed exceeds 200 square feet or includes electricity or plumbing, a building permit is necessary. In many cases, even smaller sheds still require zoning or site plan approval to ensure proper placement on your lot.
For specific guidelines, it’s best to contact your local city’s planning or building department. For example, the City of Ramsey can be reached at 763-433-9850, and North St. Paul at 651-747-2400.
Does Red Lake County, MN, Require Shed Permits?
In Red Lake County, MN, a shed permit is often required especially if you’re building in shoreland areas regulated by the county. These zones have specific rules on setbacks, materials, and placement. Outside of shoreland zones, zoning requirements may vary by township, so be sure to check with your local officials.
If your property is within city limits, such as Red Lake Falls, you’ll need to follow city-specific regulations. The City of Red Lake Falls handles its own shed permits and may have unique guidelines on siding, location, or size.
For full details, contact Red Lake County Planning & Zoning or reach the City of Red Lake Falls directly at 218-253-2684.
Does Redwood County, MN, Require Shed Permits?
Yes, Redwood County, MN, requires a permit for sheds and accessory structures. Whether you’re building new or moving an existing shed, you’ll need approval from the county’s Zoning Administrator. Your application should include a site plan showing your shed’s location and distances from property lines to ensure it meets local setback rules.
If your property is inside the City of Redwood Falls, you’ll need to follow city-specific permitting rules instead. For help, reach out to the Redwood Falls Planning & Zoning Department at 507‑616‑7400.
In short before placing a shed in Redwood County or Redwood Falls, double-check with the local zoning office to make sure your project is fully permitted.
Does Renville County, MN, Require Shed Permits?
Yes, Renville County, MN requires a Land Use Permit for most sheds in unincorporated areas. Whether you’re building new or moving a shed, you’ll need to submit a site plan showing setbacks and lot lines to ensure your project meets zoning and environmental rules. Small sheds under 150 square feet may qualify for exemptions but usually still need approval.
If your property is inside city limits, like in the City of Renville, permits are handled locally by the city’s building or zoning department.
To get started, download the Land Use Permit application and contact Renville County Environmental Services at 320-523-3768 for assistance.
Does Rice County, MN, Require Shed Permits?
Yes, Rice County, MN requires permits for sheds, with rules varying based on size and location. If you’re in an unincorporated area, a Land Use Permit is needed for sheds under 200 square feet, while larger sheds require a full building permit. Both require a site plan and must meet setback, floodplain, and structural regulations.
For properties inside cities like Faribault, Lonsdale, Morristown, or Northfield, you’ll need to follow each city’s permit process instead.
To apply or get more info, visit Rice County’s online permitting portal or call Environmental Services at 507-332-6113. Note that Bridgewater Township handles its own permits separately.
Does Rock County, MN, Require Shed Permits?
Yes, Rock County, MN requires a Land Use Permit for most sheds and accessory buildings in unincorporated areas. This includes new construction, moving, or modifying existing structures. Your application should include a site plan that shows your shed’s placement and meets local setback rules, 65 feet from township roads and 130 feet from county or state highways.
If your property is within city limits, such as Luverne, you’ll need to follow that city’s permitting process instead.
To get started, visit the Rock County Planning and Zoning page or call 507-283-8862 for guidance and applications.
Does Roseau County, MN, Require Shed Permits?
Yes, Roseau County, MN requires a Land Use Permit for most sheds in unincorporated areas to ensure they meet zoning and setback requirements. Your application should include a site plan showing the shed’s location and compliance with local regulations, including floodplain rules if applicable.
If your property is within the City of Roseau, you’ll need a separate building permit. It’s a good idea to consult the City’s Community Development Office at 218-463-5003 to understand specific city requirements and exemptions.
Before starting, contact the Roseau County Zoning Administrator or the City of Roseau to make sure your shed project follows all local codes.
Does St. Louis County, MN, Require Shed Permits?
Yes, St. Louis County, MN requires a Land Use Permit for most sheds and accessory buildings in unincorporated areas. This includes new builds, relocations, or modifications. If your shed is near lakes or rivers, expect additional shoreland regulations and possible Performance Standard Permits.
If your property is inside cities like Duluth or Virginia, permits are handled by the local city offices.
To apply, submit a site plan with your application through the county’s online portal or office, and be prepared for fees based on the shed size. For help, contact St. Louis County Planning at (218) 725-5000 or email landuseinfo@stlouiscountymn.gov.
Does Scott County, MN, Require Shed Permits?
In Scott County, MN, permits for sheds depend on size and location. For unincorporated areas, sheds 200 square feet or smaller don’t require a building permit, but larger sheds do. All projects must comply with zoning setbacks and may need additional approvals if near wetlands or other protected areas.
If you live within city limits then you must follow your city’s specific building and zoning rules.
To apply or learn more, visit Scott County Building Inspections or call 952-496-8653. Make sure to prepare a site plan and any necessary documents to streamline your permit process.
Does Sherburne County, MN, Require Shed Permits?
In Sherburne County, MN, most sheds require a building permit, especially for new construction, relocation, or modifications. If your property is in a shoreland area near lakes or rivers, additional setback and zoning rules apply, and you might need a Performance Standard Permit.
Applications must include a site plan with details on location and distances from property lines. You can submit permits online, by email, or in person.
If you live within city limits, like Baldwin, check with your city’s zoning office for their permit process. For more info, visit Sherburne County’s Building Permits page or call 763-765-4450.
Does Sibley County, MN, Require Shed Permits?
In Sibley County, MN, sheds smaller than 200 square feet typically don’t require a zoning permit or fee. However, for structures 200 square feet and larger, you must obtain a zoning permit before building or relocating.
To apply, submit a zoning request form along with a site plan showing the shed’s location and setbacks. The county zoning office reviews your application and notifies you when it’s approved. If your property is inside a city like Gaylord or Henderson, check with the city’s building department, as they handle permits separately.
For assistance, contact Sibley County Zoning at (507) 237-4091 or email zoning@sibleycounty.gov.
Does Stearns County, MN, Require Shed Permits?
In Stearns County, MN, a Construction Site Permit is required for most sheds in unincorporated areas, whether you’re building new, moving, or modifying an existing structure. Your application needs a site plan showing the shed’s location and compliance with setbacks.
If you’re inside a city like St. Cloud or Sauk Centre, permits are handled by the city’s building department instead.
To apply, submit your documents online or in person, and expect fees based on shed size. For questions, contact Stearns County Planning at 320-656-3613.
Does Steele County, MN, Require Shed Permits?
In Steele County, MN, a zoning permit is generally required for most sheds in unincorporated areas, including new builds, relocations, or modifications. Your permit application should include a site plan detailing the shed’s placement and compliance with setbacks.
If your property is within a city like Owatonna, Medford, or Blooming Prairie, you’ll need to follow that city’s permit process instead.
To apply, submit your documents online, by email, or in person, and expect fees based on the size of your shed. For questions, contact Steele County Planning at 507-444-7475.
Does Stevens County, MN, Require Shed Permits?
In Stevens County, MN, most sheds require a land use permit if they exceed 240 square feet or have a permanent footing. This applies to new builds, relocations, and modifications, including garages and pole buildings. Agricultural buildings also need permits under current rules.
If your property is within city limits like Morris or Donnelly, you’ll need to follow that city’s permit process instead.
To apply, submit a site plan and application to the county’s zoning office—online, by mail, or in person. Fees vary by size, starting around $165. For assistance, contact Stevens County Planning at 320-208-6558.
Does Swift County, MN, Require Shed Permits?
In Swift County, MN, you’ll need a permit for any shed you plan to build. The county requires a zoning permit for all shed sizes to make sure your structure meets local setback and placement rules, this applies whether your shed is big or small.
If your shed is larger than 200 square feet, Minnesota’s building code kicks in and you’ll also need a building permit. Smaller sheds (200 sq. ft. or less) only need the zoning permit. Planning to run electricity? You’ll need an electrical permit too.
To get started, reach out to Swift County Environmental Services at 320-843-2356 for permit details and to confirm your project meets all requirements.
Does Todd County, MN, Require Shed Permits?
Yes, you’ll need a permit to build a shed in Todd County, MN. All sheds require a zoning permit from the Todd County Planning & Zoning office to ensure you meet local placement and setback rules.
If your shed is over 200 square feet, a state building permit is also required. Sheds 200 square feet or smaller are exempt from the state building permit, but still need county zoning approval. Planning to add electricity? You’ll need an electrical permit as well.
For the most up-to-date info or to start your permit application, contact Todd County Planning & Zoning at 320-732-4420.
Does Traverse County, MN, Require Shed Permits?
Traverse County, MN, requires a zoning permit for any shed you build, regardless of size. This local permit makes sure your shed placement and use follow county rules. If your shed is larger than 200 square feet, you’ll also need a state building permit to meet Minnesota’s building code.
All sheds must meet local setback, floodplain, and shoreland requirements, and if you plan to add electricity, an electrical permit is always required.
For the latest permit details and to get started, contact Traverse County Zoning or Hometown Planning in Alexandria at 320-762-4420.
Does Wabasha County, MN, Require Shed Permits?
Wabasha County, MN requires a permit for any shed you want to build. No matter the size, you’ll need a Land Use (zoning) permit before starting construction to ensure your shed meets local placement and setback requirements.
If your shed is over 200 square feet, you’ll also need a state building permit in addition to the county permit. And if you’re planning to install electricity, an electrical permit is always necessary.
To apply or get more details, reach out to Wabasha County Planning & Zoning at 651-565-3062 or use their online GeoPermits system. Be prepared to submit a site plan and follow all setback rules.
Does Wadena County, MN, Require Shed Permits?
Yes, Wadena County, MN requires a permit for any shed you plan to build. Every shed needs a zoning (land use) permit from the county’s Planning & Zoning Department, regardless of size. If your shed is over 200 square feet, you’ll also need a building permit on top of the zoning permit.
Electrical work, such as adding outlets or lighting, always requires a separate electrical permit and inspection.
To start your application or get more details, contact Wadena County Planning & Zoning at 218-631-7604. Be sure to include a site plan and follow any setback or shoreland rules that may apply.
Does Waseca County, MN, Require Shed Permits?
Waseca County, MN requires a permit for most sheds you want to build or place on your property. In nearly all cases, you’ll need a zoning (land use) permit, which ensures your shed follows local setback and land use rules. Sheds under 100 square feet in non-shoreland areas might be exempt, but only if you meet all local requirements.
If your shed is over 200 square feet, you’ll also need a building permit. Electrical permits are required for any wiring or outlets you plan to add.
To get started, apply through Waseca County’s GeoPermits system or contact Planning & Zoning at 507-835-0650. Always double-check your site plan and local rules before building.
Does Washington County, MN, Require Shed Permits?
In Washington County, MN, a permit is required for any shed you want to build, no matter the size. Both a zoning (land use) permit and a building permit are needed, even if your shed is under 200 square feet. State exemptions don’t override local rules, so plan on applying for both permits before you start construction.
If you’re adding electricity, you’ll also need an electrical permit. Setback rules and placement requirements must be followed, so include a detailed site plan when you apply.
To get started or ask questions, contact Washington County Zoning at 651-430-4300. Always wait for permit approval before beginning your shed project.
Does Watonwan County, MN, Require Shed Permits?
Watonwan County, MN requires a permit for any shed, no matter the size. Unlike some counties, there’s no exemption for smaller sheds, every structure needs a building (zoning) permit from the Land Management & Zoning Department. You’ll need to provide a site plan with your application and follow all county placement rules.
To get started, contact Watonwan County Land Management & Zoning at 507-375-1225. Be sure to apply and get approval before you begin building your shed.
Does Wilkin County, MN, Require Shed Permits?
In Wilkin County, MN, you only need a permit for a shed if it’s larger than 500 square feet. Sheds 500 square feet or smaller are exempt from county permitting, giving you plenty of flexibility for most backyard projects. If your shed goes over that size, a zoning/building permit is required, and the application fee is $100.
For sheds over 500 square feet, contact the Wilkin County Environmental Office for the permit process. When in doubt, it’s always smart to double-check with the county before building.
Does Winona County, MN, Require Shed Permits?
Winona County, MN requires a zoning permit for nearly all sheds, regardless of size. If your shed is larger than 200 square feet, you’ll also need a building permit to comply with state construction codes. Any wiring or electrical work in your shed will require a separate electrical permit.
To get started, apply online or contact Winona County Planning & Environmental Services at 507-457-6520. Make sure to include a site plan with your application and wait for approval before building.
Does Wright County, MN, Require Shed Permits?
In Wright County, MN, you’ll need a permit for any shed larger than 200 square feet. Sheds that are 200 square feet or smaller don’t require a building permit, but you must still follow local zoning rules for setbacks and placement. If you plan to add electricity to your shed, an electrical permit is always required, no matter the size.
For larger sheds, apply through the Wright County Planning & Zoning Office at 763-682-7338. Make sure to include a site plan and wait for approval before building.
Does Yellow Medicine County, MN, Require Shed Permits?
Yellow Medicine County, MN requires a Land Use Permit for any shed you build or place, no matter the size. Even small sheds must get county zoning approval before construction begins. While state law exempts sheds 200 square feet or smaller from needing a building permit, the county’s permit is still necessary.
If you plan to wire your shed for electricity, you’ll also need a separate electrical permit.
To get started, contact Yellow Medicine County Land & Resource Management at 320-669-7524 and include a site plan with your application. Always wait for county approval before building your shed.
Which Cities in Minnesota Require a Shed Permit?
Municipality | Building Permits |
---|---|
Blaine | Building Permit |
Woodbury | Building Permit |
Arden Hills | Building Permit |
Farmington | Building Permit |
Fridley | Building Permit |
Hopkins | Building Permit |
Owatonna | Building Permit |
Sauk Rapids | Building Permit |
St. Paul | Building Permit |
North St. Paul | Building Permit |
Austin | Building Permit |
Apple Valley | Building Permit |
East Bethel | Building Permit |
Proctor | Building Permit |
La Crescent | Building Permit |
Robbinsdale | Building Permit |
Ramsey | Building Permit |
Burnsville | Building Permit |
New Brighton | Building Permit |
Stillwater | Building Permit |
Rosemount | Building Permit |
Buffalo | Building Permit |
Bayport | Building Permit |
Edina | Building Permit |
Bloomington | Building Permit |
Minneapolis | Building Permit |
Eagan | Building Permit |
Maple Grove | Building Permit |
Plymouth | Building Permit |
Does Blaine, MN, require shed permits?
Yes, Blaine, MN requires a permit for every shed. For sheds up to 200 square feet, you’ll need to apply for an Accessory Building/Shed Permit through the city’s online portal. Anything larger than 200 square feet is considered a garage and requires a Garage Permit. Both permits ask for a site plan and placement details.
Always review the zoning rules to make sure your shed meets setback requirements. For questions or to start your application, contact Blaine’s Planning Department at 763-717-2748 before you build.
Does Woodbury, MN, require shed permits?
In Woodbury, MN, sheds over 200 square feet require a building permit. Sheds that are 200 square feet or smaller don’t need a permit, but you still have to follow all local zoning rules for setbacks, height, and proper placement on your lot. Before you build, review the Accessory Building Ordinance Summary and check the Accessory Building Permits page for details. For any questions, contact Woodbury’s Building Inspections team at 651-714-3500.
Does Arden Hills, MN, require shed permits?
In Arden Hills, MN, permit requirements for sheds depend on size. Sheds smaller than 120 square feet don’t need a permit but must still follow all zoning rules. For sheds between 120 and 200 square feet, a zoning permit is required. Anything over 200 square feet will need a building permit along with construction plans.
Make sure to review placement, setback, and height restrictions before you build. For more details or to start your application, contact Arden Hills’ Building & Engineering Department at 651-792-7800.
Does Farmington, MN, require shed permits?
In Farmington, MN, you only need a building permit if your shed is larger than 200 square feet. Sheds up to 200 square feet don’t require a permit but must be placed in your backyard or side yard, respect all setback rules, and not exceed 12 feet in height. For larger sheds, you’ll need to submit detailed plans and a property survey for approval.
Questions or ready to apply? Contact Farmington’s Building Inspection office at 651-280-6830. Always follow the city’s placement and construction rules to keep your project on track.
Does Fridley, MN, require shed permits?
In Fridley, MN, you’ll need a permit for any shed you want to build, no matter the size. The first shed or accessory structure on your lot requires a standard Accessory Building Permit. If you’re adding a second shed or building one over 240 square feet, you’ll need a Special Use Permit instead.
To get started, review the Accessory Building Handout (PDF) and apply online through Fridley’s CitizenServe Permitting Portal. For questions, contact the city at 763-571-3450 before starting construction.
Does Hopkins, MN, require shed permits?
In Hopkins, MN, you won’t need a building permit if your shed is 200 square feet or smaller, but you must still meet all zoning requirements, including keeping your shed at least three feet from property lines and out of easements. Sheds larger than 200 square feet are considered detached garages and do require a building permit, along with site and building plans.
For more details or to apply, contact Hopkins Inspections at 952-548-6320 before you build.
Does Owatonna, MN, require shed permits?
In Owatonna, MN, a zoning permit is required for any shed up to 200 square feet, while sheds larger than that also need a building permit, along with your zoning review. For either permit, you’ll need a site plan showing your shed’s placement and setbacks from property lines.
Check out Owatonna’s storage shed FAQ and the permit guide for all the details. For questions or to apply, contact Owatonna’s Building Inspections at 507-444-4370. Always get your permit approved before construction begins.
Does Sauk Rapids, MN, require shed permits?
In Sauk Rapids, MN, sheds over 200 square feet require a building permit. Sheds that are 200 square feet or smaller don’t need a building permit, but you must still follow all zoning, setback, and placement rules. Before building any shed, make sure it isn’t placed on an easement and complies with local requirements.
For larger sheds, apply for your permit through the Building Safety Department at City Hall. If you have questions or need help with your site plan, visit the office during business hours. Always confirm the latest city rules before you start your project.
Does St. Paul, MN, require shed permits?
In St. Paul, MN, you don’t need a building permit for a shed that’s 200 square feet or smaller, but zoning rules like setbacks and total lot coverage still apply. For sheds larger than 200 square feet, or if your property is in a historic district, a building permit is required and extra approvals may be needed.
Before you start building, double-check your project against St. Paul’s zoning standards and contact the Department of Safety & Inspections at 651-266-8989 for guidance or to apply for permits. Always confirm you have the right approvals before breaking ground.
Does North St. Paul, MN, require shed permits?
In North St. Paul, MN, you’ll need a building permit for any shed you plan to build, regardless of size. All sheds must follow the city’s rules for setbacks, height limits, and placement, so be sure to include a site plan with your permit application.
Apply online using the city’s Baseline portal, or reach out to Community Development at 651-747-2407 if you have questions. Always get your permit approved before starting your shed project.
Does Austin, MN, require shed permits?
In Austin, MN, sheds up to 200 square feet need a zoning permit, while anything larger requires a building permit. You’ll need to submit a site plan with your application and make sure your shed meets setback requirements, at least 5 feet from property lines, and more for corner lots.
For larger sheds, contact the Building Department at 507-437-9950. Always wait for your permit to be approved before you start construction, and be sure to follow all placement and lot coverage rules.
Does Apple Valley, MN, require shed permits?
In Apple Valley, MN, you won’t need a building permit if your shed is 200 square feet or less, as long as it’s one story and meets all setback and placement rules. For anything larger, a building permit is required so be ready to provide a site survey and construction plans. Remember, sheds must be properly anchored, and only two accessory structures are allowed per lot.
If you have questions about requirements or want to start your application, call Apple Valley’s Building Inspections Division at 952-953-2588 before you begin your project.
Does East Bethel, MN, require shed permits?
In East Bethel, MN, sheds over 200 square feet need both a building and zoning permit. Sheds that are 200 square feet or smaller don’t require a building permit, but you must still meet all zoning setback and placement rules. Only one small shed (200 sq ft or less) is allowed per property in addition to other accessory buildings, and your shed should match your home’s exterior.
For larger sheds, submit your plans to City Hall or call 763-367-7840 for details before building. Always double-check local requirements to make sure your shed is in the right spot and fully compliant.
Does Proctor, MN, require shed permits?
In Proctor, MN, you’ll need a zoning permit for any shed up to 200 square feet, while larger sheds require both a building permit and zoning approval. Setback rules apply as well, you must keep your shed at least 5 feet from property lines and 10 feet from your house. Maximum accessory building size is 1,200 square feet, and height is limited to 18 feet.
For questions or to apply, visit Proctor City Hall or call 218-624-3641. Always secure your permit before starting your shed project.
Does La Crescent, MN, require shed permits?
In La Crescent, MN, you won’t need a permit if your shed is 120 square feet or less, as long as it meets setback requirements and isn’t in a floodplain. For any shed over 120 square feet, you’ll need to apply for a building permit through the city’s GeoPermits system. Make sure to avoid placing your shed within easements and double-check additional rules if you’re building near water.
If you have questions or are ready to apply, contact City Hall or use the GeoPermits portal before you start construction.
Does Robbinsdale, MN, require shed permits?
In Robbinsdale, MN, you’ll need a building permit for any shed, no matter the size. Be prepared to submit site plans and construction details through the city’s online permitting system. If your shed will have electricity or plumbing, separate permits and licensed contractors are required.
Questions about the process? Call 763-531-1268 or email permits@robbinsdalemn.gov before starting your project to make sure you have everything covered.
Does Ramsey, MN, require shed permits?
In Ramsey, MN, you don’t need a building permit for sheds 200 square feet or smaller, but you must still follow all zoning rules, including setbacks, height, and placement. For sheds larger than 200 square feet, a building permit is required, and you’ll need to submit detailed construction plans and a site layout through the city’s ePermits portal.
If you’re unsure about requirements or need help with your application, call Ramsey’s Building Department at 763-433-9850 before you start building.
Does Burnsville, MN, require shed permits?
In Burnsville, MN, you’ll need a building permit if your shed is larger than 200 square feet. Sheds up to 200 square feet don’t require a permit but must still meet zoning rules for placement and setbacks. All sheds must stay out of easements and be properly anchored.
For larger sheds, submit your plans, a property survey, and building details through the city’s permitting process. If your shed will include electricity, a separate electrical permit is also required. Contact Burnsville’s building department if you have questions before starting your project.
Does New Brighton, MN, require shed permits?
In New Brighton, MN, you’ll need a building permit if your shed is over 200 square feet. For sheds 200 square feet or less (and only one story), no permit is required, but you still have to follow zoning setbacks and avoid placing your shed in utility easements.
If your shed is larger, submit building plans to the city before construction begins. For questions or to apply, reach out to the New Brighton Building Department or check their online permit portal.
Does Stillwater, MN, require shed permits?
In Stillwater, MN, most residential sheds up to 120 square feet and one story high don’t need a building permit, but you do need approval from the Planning Department. Your shed must be placed in the rear or side yard, follow setback rules, and match your home’s exterior style. Always submit a site plan to the city before building, and contact the Planning Department at 651-430-8820 if you’re unsure about your project.
Does Rosemount, MN, require shed permits?
In Rosemount, MN, you don’t need a building permit for a shed up to 200 square feet, but you must still follow the city’s rules for placement, setbacks, and exterior finishes. Sheds over 200 square feet require a building permit, along with detailed construction and site plans.
Always keep your shed out of easements, maintain the required distance from property lines, and make sure it complements your home’s style. For questions or to apply for a permit, call Rosemount Community Development at 651-322-2024 before starting your project.
Does Buffalo, MN, require shed permits?
In Buffalo, MN, you won’t need a building permit if your shed is under 200 square feet, but you do need to follow the city’s zoning rules. You must keep your shed in the backyard, at least 10 feet from your house or garage, and out of any easements. For sheds 200 square feet or larger, a building permit is required along with a site plan.
Questions or ready to apply? Contact Buffalo’s building department at 763-682-1181 or email permits@ci.buffalo.mn.us before you get started.
Does Bayport, MN, require shed permits?
In Bayport, MN, a permit is required for every shed. You’re allowed one shed per property, up to 120 square feet and 12 feet tall. Make sure your shed is at least 5 feet from property lines, 20 feet from the street, and matches the exterior of your home. Before you build, fill out the shed permit application and submit it to City Hall. For questions, contact Bayport at 651-275-4404.
Does Edina, MN, require shed permits?
In Edina, MN, you won’t need a building permit for a shed that’s 200 square feet or smaller, but you do need to follow all setback rules, keep your shed at least 3 feet from property lines in the rear yard and 5 feet if placed on the side. For sheds larger than 200 square feet, a building permit is required before you start construction.
If you’re unsure about your shed’s placement or need help with permits, call Edina’s Building Inspections at 952-826-0372. Always double-check local requirements so your project goes smoothly.
Does Bloomington, MN, require shed permits?
In Bloomington, MN, you don’t need a building permit for a one-story shed that’s 200 square feet or less, but you do need to follow all local zoning rules, including setbacks, height limits, and matching your home’s exterior. If your shed is larger than 200 square feet, a building permit is required.
Questions? Reach out to Bloomington’s Building & Inspections team at 952-563-8930 or inspections@bloomingtonmn.gov before you get started.
Does Minneapolis, MN, require shed permits?
In Minneapolis, MN, sheds 200 square feet or smaller don’t require a building permit but must get zoning approval to ensure proper setbacks and placement. For sheds larger than 200 square feet, both a building permit and zoning review are mandatory.
Make sure your shed meets height, anchoring, and exterior finish requirements. If you have questions or need to apply, contact Minneapolis 311 or call 612-673-3000 for guidance.
Does Eagan, MN, require shed permits?
In Eagan, MN, sheds 200 square feet or smaller require a zoning permit to ensure they meet setback and placement rules, but they don’t need a building permit. For sheds larger than 200 square feet, both a building permit and zoning approval are necessary.
To apply, use Eagan’s online permit portal and include a site plan and construction details if your shed is large. If you have questions, contact Eagan Community Development at 651-675-5600 before starting your project.
Does Maple Grove, MN, require shed permits?
In Maple Grove, MN, sheds 200 square feet or smaller require a zoning permit but don’t need a building permit. Sheds larger than 200 square feet must have both a building permit and zoning approval.
Sheds must be at least 25 feet from the front property line and 5 feet from the side and rear. They cannot be placed in easements, and lakeshore properties require a 75-foot setback from the water. Maximum height is 15 feet, and total accessory buildings can’t exceed 1,254 square feet on a lot.
For permits or questions, contact Maple Grove Community Development at 763-494-6040 before building.
Does Plymouth, MN, require shed permits?
In Plymouth, MN, sheds up to 200 square feet require a zoning permit but no building permit. For sheds larger than 200 square feet, both a building permit and zoning approval are necessary.
Sheds must follow setback rules, typically placed in the rear or side yard, and must not exceed height limits, usually around 15 feet. To apply, use Plymouth’s online permit portal or contact Community Development at 763-675-5600 for guidance before you begin building.
How Do I Get a Shed Permit in MN?

Getting a shed permit in Minnesota depends largely on the size of your shed and whether you’re in a city or an unincorporated area. Generally, sheds 200 square feet or smaller don’t need a building permit but must follow local zoning rules like setbacks. Larger sheds require a building permit and must meet state building codes.
If your property is within a city, check with the local building department for their specific requirements. In unincorporated areas, you’ll usually need a zoning permit from your county, which involves submitting a site plan showing the shed’s location and dimensions.
Planning electrical work? You’ll need a separate electrical permit regardless of shed size.
To start, contact your city or county zoning office, prepare your site plan and application, submit the paperwork, and schedule any required inspections. This ensures your shed project is legal and safe.
How Much Does a Shed Permit Cost in MN?

Shed permit costs in Minnesota vary depending on the size of your shed and where you live. For smaller sheds, many counties and cities charge modest zoning or building permit fees ranging from $20 to $50.
For larger sheds over 200 square feet, building permit fees are usually based on the total construction value. Fees can start around $50 and increase with project cost, sometimes including additional plan review and state surcharges.
To get an accurate estimate, check with your local city or county building department, as fee structures and requirements differ across Minnesota.
How Long Does it Take to Get a Permit in MN?

The time it takes to get a shed permit in Minnesota depends on your location and project details. For simple residential sheds under 200 square feet, permits often take 1 to 3 business days to process. Larger sheds or those requiring detailed plan reviews typically take 5 to 10 business days.
Commercial shed permits can take 2 to 6 weeks, depending on project complexity.
How Long Does a Shed Permit Last in MN?

In Minnesota, a shed permit usually lasts for 180 days from the date it’s issued. If work hasn’t started within that time, the permit can expire. Similarly, if construction begins but is paused or abandoned for 180 days, the permit may no longer be valid.
Many local jurisdictions allow you to request a one-time extension of up to 180 days if you provide a valid reason before the permit expires. If the permit does expire without an extension, you’ll likely need to reapply.
To avoid delays or fines, check with your local building department for exact timelines and keep track of your permit status throughout your project.
What’s The Penalty for Not Getting a Shed Permit in MN?

Building a shed in Minnesota without the required permit can lead to serious consequences. Violating state building codes is considered a misdemeanor and may result in fines or even legal action. Local cities and counties often impose additional penalties such as stop-work orders, double fees, or orders to remove the structure.
Unpermitted sheds can also create problems when selling your property, as buyers and lenders typically require proof that all work was done legally.
To avoid these issues, always check with your local building department before starting construction, secure the necessary permits, and follow all inspection requirements. Staying compliant protects your investment and peace of mind.
Ready to Build Your Dream Shed in Minnesota?

Don’t let permits or uncertainty slow you down. Whether you need extra storage, a workshop, or a cozy backyard retreat, our wide selection of customizable shed models has you covered. Plus, getting started is easy with a free, no-obligation quote tailored just for you.